Irsah in Designs
Summary A government related agency required an extensive re-work and re-construct of interior spaces and rooms, converted from an existing hostel building.
Works include the initial design, theme and layout, floor plans, illustrations, interior furniture and presentation tools with complete documentation including costs. The design was totally focused on minimal re-built of existing structures and walls.
Duration: 2 weeks
Completed: 10 days including floor plan layout, illustration, bills of quantity and presentation / documentation tools.